Bathroom renovations in Bristol
We take bathrooms back to bare walls and joists, fix what we find, and tank every wet area before tiling. Most bathrooms take three to four weeks, and we plan the work so you always have a working toilet.
Typical cost
£14,000 to £26,000
Time on site
3 to 4 weeks on site

What’s included
A family bathroom with a new suite, tiling, underfloor heating and an extractor fan. En suites start at £11,000. Includes VAT.
Strip-out to bare walls and joists
Repairs to joists and the subfloor
Tanking of every wet area before tiling
New pipework, waste and electric underfloor heating
An extractor fan vented outside
Tiling, sanitaryware, fittings and decorating
What we find under old bathrooms
In houses built before 1950, about one bathroom in three has rot in a joist under the bath or toilet, usually from a slow leak that nobody saw. We price a day of repairs into every bathroom quote. If we don’t need it, it comes off the final invoice.
Tanking and ventilation
Tiles and grout are not waterproof. Every shower area gets a tanking membrane on the walls and floor before tiling, and every bathroom gets an extractor fan ducted to the outside, not into the loft.

Questions we get asked
Other services