Bathroom renovations in Bristol

We take bathrooms back to bare walls and joists, fix what we find, and tank every wet area before tiling. Most bathrooms take three to four weeks, and we plan the work so you always have a working toilet.

Typical cost

£14,000 to £26,000

Time on site

3 to 4 weeks on site

What’s included

A family bathroom with a new suite, tiling, underfloor heating and an extractor fan. En suites start at £11,000. Includes VAT.

Strip-out to bare walls and joists

Repairs to joists and the subfloor

Tanking of every wet area before tiling

New pipework, waste and electric underfloor heating

An extractor fan vented outside

Tiling, sanitaryware, fittings and decorating

What we find under old bathrooms

In houses built before 1950, about one bathroom in three has rot in a joist under the bath or toilet, usually from a slow leak that nobody saw. We price a day of repairs into every bathroom quote. If we don’t need it, it comes off the final invoice.

Tanking and ventilation

Tiles and grout are not waterproof. Every shower area gets a tanking membrane on the walls and floor before tiling, and every bathroom gets an extractor fan ducted to the outside, not into the loft.

Recent projects

Recent projects

Finished jobs of this kind, with the house, the time on site and the final cost.

Finished jobs of this kind, with the house, the time on site and the final cost.

Will we have a working toilet during the work?

Can you move the toilet to the other wall?

Do you supply the tiles and suite?

Create a free website with Framer, the website builder loved by startups, designers and agencies.