Renovation projects in Bristol
Kitchens, lofts, extensions and restorations we’ve finished since 2024, with the house, the time on site and what each one cost.
Show projects for

Kitchens
Redland
2026
Kitchen refit in a Redland semi
A dark kitchen with a smoked oak island, built after taking out the wall between the old kitchen and the back reception room.
Time on site
7 weeks
Cost
£52,400

Extensions
Bishopston
2025
Side-return extension in a Bishopston terrace
A 19 m² side-return extension with a glass roof, which turned a galley kitchen into a kitchen with room for a dining table.
Time on site
17 weeks
Cost
£118,000

Loft conversions
Southville
2025
Dormer loft conversion in Southville
A rear dormer that added a double bedroom and a shower room under the eaves, with a view across to Totterdown.
Time on site
11 weeks
Cost
£71,500

Period restoration
Clifton
2024
Restoring a Georgian townhouse in Clifton
Fourteen sash windows overhauled, lime plaster repaired on four floors, and the drawing room cornice recast from a surviving section.
Time on site
7 months
Cost
£238,000

Bathrooms
Henleaze
2026
Family bathroom in a Henleaze semi
The original 1930s bathroom and separate toilet knocked into one room, with a walk-in shower and a freestanding bath.
Time on site
4 weeks
Cost
£21,800

Whole-house renovations
Westbury-on-Trym
2025
Whole-house renovation in Westbury-on-Trym
A 1960s house rewired, insulated and re-rendered, opened up at the back, with a new kitchen, three bathrooms and an air source heat pump.
Time on site
8 months
Cost
£312,000