Whole-house renovation in Westbury-on-Trym
A 1960s house rewired, insulated and re-rendered, opened up at the back, with a new kitchen, three bathrooms and an air source heat pump.
Area
Westbury-on-Trym
Time on site
8 months
Cost
£312,000
Finished
2025

What we did
House
1960s detached house
Service
Whole-house renovations
Site lead
Dan Pritchard
External wall insulation and new lime render over the pebbledash
New aluminium windows and larch cladding
Opened the back of the house into one kitchen and living room
Air source heat pump with larger radiators and underfloor heating downstairs
New oak staircase
Full rewire, three bathrooms and a new kitchen



Before and after
The house had its original wiring, a 1990s gas boiler and single-glazed windows in brown uPVC frames from the 1980s. The owners bought it to stay for twenty years, so the brief was to fix everything once.
We insulated the outside walls under a new render, which made a heat pump practical without losing room inside. At the back, two small rooms and a lean-to became one kitchen and living room with wide glazed doors to the garden. The family rented nearby for the eight months and got a cost report every two weeks.
Leila sent us a cost report every fortnight. We added a heat pump halfway through, and the price she gave us for it was the price we paid.
Anika B., Westbury-on-Trym

Kitchens
Redland
2026
Kitchen refit in a Redland semi
A dark kitchen with a smoked oak island, built after taking out the wall between the old kitchen and the back reception room.
Time on site
7 weeks
Cost
£52,400

Extensions
Bishopston
2025
Side-return extension in a Bishopston terrace
A 19 m² side-return extension with a glass roof, which turned a galley kitchen into a kitchen with room for a dining table.
Time on site
17 weeks
Cost
£118,000
